First Group Engineering
First Group Engineering
  • Home
  • SERVICES
    • Transportation
    • Traffic Engineering
    • Construction Inspection
    • Land Surveying
    • Right of Way
    • Telecommunications
  • About
  • Careers
  • Connect
  • More
    • Home
    • SERVICES
      • Transportation
      • Traffic Engineering
      • Construction Inspection
      • Land Surveying
      • Right of Way
      • Telecommunications
    • About
    • Careers
    • Connect

  • Home
  • SERVICES
    • Transportation
    • Traffic Engineering
    • Construction Inspection
    • Land Surveying
    • Right of Way
    • Telecommunications
  • About
  • Careers
  • Connect

Traffic Engineering

As our Indiana cities and towns continue to grow, governments are working tirelessly to improve traffic flow and increase driver and pedestrian safety.  Whether it’s a potential traffic increase from a proposed new development or improvement of existing intersection crosswalks and signals, we can help by providing impact studies, traffic analysis, signal design and more. 

          

  • Traffic Counting      
  • Traffic Accident Analysis      
  • Traffic Signal Warrant Analysis     
  • Traffic Demand Modeling     
  • Signal Modernization and Timing      
  • Computerized Traffic Signal Control      
  • Traffic Impacts of Site Development      
  • Traffic Signal Design
  • Street Lighting Design
  • Traffic Signal Design
    • Standard loop inductance detection design
    • GPS Interconnection (Low-Cost)
    • Wireless (retrofitting existing systems)    
    • Modem (network design)
    • Retrofit existing signal for pedestrian/ADA compliance 


First Group Engineering offers professional support in project feasibility and developing a scope of work, assistance in obtaining financing, design services, construction observation and more.  Let’s talk about your project and how we can help!

Connect with us

featured projects

Meridian Street at 54th Street Traffic Signal Installation City of  Indianapolis DPW        


This locally-funded project included the design of plans and specifications for the placement of a new traffic signal, including ADA sidewalk ramps on each corner. 

HAWK Signals - 165th St. & Howard Ave.  City of Hammond, Indiana   

    

 First Group Engineering provided the survey, design, utility coordination, and construction inspection for this locally-funded project.  A HAWK signal system was installed at this location to enhance safety for pedestrians and bicyclists crossing the 165th Street roadway. 

Section Street and Washington Street Intersection Improvement Project City of Sullivan, Indiana     


 This project included design and construction supervision for a new traffic signal installation in Downtown Sullivan, including new curb ramps, pedestrian indications, and sidewalks for this Federal-Aid LPA Project. 

45th Street & 5th Street Intersection 

Improvements Town of Highland, Indiana 


 This project included roadway resurfacing and widening on 45th Street to accommodate new opposing left turn lanes in addition to new traffic signals, street lighting, sidewalks, ADA ramps, storm sewers, and significant utility coordination which involved several utility relocations.  First Group Engineering also performed the right of way engineering, right of way acquisition management services, and construction inspection. 

Follow Us

Copyright © 2022 First Group Engineering, Inc - All Rights Reserved.


Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept